MG Projects

Tier 1 Contractor – BOP Concept Design for a 600MW Windfarm

The Project

Owner: Multiple

Location: Vic, SA, NSW and Qld

Client: Multiple

Project: Multiple large scale windfarms up to 600MW

Role: BOP Concept Design

Completion Date: Ongoing

SERVICES PROVIDED

  • 33kV Collector circuit design and cable selection
  • Substation layout (220/66/33kV)
  • Civil and structural concept design
  • General power system advice for BOP Contractor

VALUE ADDED

  • Optimisation of 33kV collector circuits
  • Optimisation of substation layouts
  • Rapid turn-around of design during tight tender timeframes