CPB BV JV – Kew Pumping Station – 11kV Switchboard Replacement (2018)

The Project

Owner: Melbourne Water Corporation

Location: Kew East, VIC

Client: CPB BV JV

Project: 11kV Switchboard Replacement

Role: Detailed Design and Construction Support

Completion Date: Q1 2018

SERVICES PROVIDED

  • Equipment and Switchroom Layouts
  • Cabling (cable schedules, termination diagrams, cable routing)
  • Civil, structural design
  • Cut over plans, including back up supplies
  • Control panel and control system design
  • Update all associated existing drawings
  • Fault study reports and protection relay settings modelling
  • High level control and operating philosophy
  • Safety in Design and HAZOP workshops and reports
  • Design Reports and As Builts as per red line mark-ups

VALUE ADDED

  • Introduction of Partial Differential Scheme
  • Designing temporary remote operation during the cutover by introducing “Umbilical Cord Design”
  • Managing cutover risks to obtain N-1 supply at all times.
  • Scope of Works documents provided at earlier stages for pricing
  • Timely submission of deliverables